01-11-13 2011 Road Rehabilitation Project

ID: 
01-11-13
Originating Department: 
DPW/Engineering
Project Contact: 
Yelma Desseta
Pre-Bid Meeting: 
Non-Mandatory - Wednesday, April 27, 2011 at 10:00 AM, Keene Public Works Dept., 350 Marlboro St., Keene
Engineer: 
In-House
Due Date / Time: 
05/19/2011 - 2:00pm
Total Addenda Issued: 
1
Notes: 
Bid specifications and plans may be obtained by contacting GEM GRAPHICS, 415 Marlboro Street, Keene, NH (603)352-7112. Update issued 5/18/11.

Project Cost Estimates:
Paving - 1.4 to 1.45M
Sewer Repairs - 155 to 165K

Status: 
Archive
Awarded To: 
Frank W. Whitcomb Construction Corp.
AttachmentSize
01-11-13 Project Manual - Complete.pdf4.02 MB
01-11-13 Drawing Page 1.pdf127.11 KB
01-11-13 Drawing Page 2.pdf542.55 KB
01-11-13 Drawing Page 3.pdf498.03 KB
01-11-13 Drawing Page 4.pdf497.54 KB
01-11-13 Drawing Page 5.pdf561.34 KB
01-11-13 Drawing Page 6.pdf456.78 KB
01-11-13 Drawing Page 7.pdf679.25 KB
01-11-13 Drawing Page 8.pdf873.49 KB
01-11-13 Drawing Page 9.pdf618.71 KB
01-11-13 Drawing Page 10.pdf566.39 KB
01-11-13 Drawing Page 11.pdf671.64 KB
01-11-13 Drawing Page 12.pdf457.9 KB
01-11-13 Drawing Page 13.pdf683.74 KB
01-11-13 Drawing Page 14.pdf268.33 KB
01-11-13 Drawing Page 15.pdf156.05 KB
01-11-13 Drawing Page 16.pdf315.03 KB
01-11-13 Drawing Page 17.pdf147.72 KB
01-11-13 Drawing Page 18.pdf173.98 KB
01-11-13 Drawing Page 19.pdf162.39 KB
01-11-13 Plan Holder List as of 04-22-11.pdf74.06 KB
01-11-13 Drawing Cover.pdf88.03 KB
01-11-13 Pre-Bid Meeting Attendance.pdf135.75 KB
01-11-13 Addendum 1.pdf439.09 KB
01-11-13 Addendum 1 - Attachment 1.pdf40.81 KB
01-11-13 Addendum 1 - Attachment 2.pdf36.67 KB
01-11-13 Addendum 1 - Attachment 3.pdf561 KB
Project 01-11-13 PlanHoldersList5-18.pdf256.3 KB
01-11-13 Informational Update 1.pdf581.69 KB
01-11-13 Bid Summary.pdf55.61 KB
01-11-13 Bid Tabulation.pdf43.75 KB